Primary Dwelling: Steel Frames Locked In

April 2026

The main dwelling is seriously taking shape now! Steel frames are locked in, rafters are running, and the roof is going on - well, sort of!

Some sections have the roofing sheets on, while others are still exposed - it's a work in progress snapshot of the build.

The main pavilion with that dramatic pitched roof is going to be such a statement piece. It's exciting watching this transform from plans to actual structure. The roof going on means we're one step closer to being weatherproof, which means one step closer to moving inside work along. Progress is flying now.