Primary Dwelling: Steel Frames Locked In

April 2026

The main dwelling is seriously taking shape now! Steel frames are locked in, rafters are running, and the roof is going on - well, sort of!

Some sections have the roofing sheets on, while others are still exposed - it's a work in progress snapshot of the build.

The main pavilion with that dramatic pitched roof is going to be such a statement piece. The roof going on means we're one step closer to being weatherproof, which means one step closer to moving inside work along. Progress is flying now.