Agape
◦ Opening Dec 2026
← The Journal
April 2026

Primary Dwelling: Steel Frames Locked In

Steel frames are locked in, rafters running, and roofing continues on the primary dwelling.

Primary Dwelling: Steel Frames Locked In

The main dwelling is seriously taking shape now! Steel frames are locked in, rafters are running, and the roof is going on - well, sort of!

Some sections have the roofing sheets on, while others are still exposed - it's a work in progress snapshot of the build.

The main pavilion with that dramatic pitched roof is going to be such a statement piece. The roof going on means we're one step closer to being weatherproof, which means one step closer to moving inside work along. Progress is flying now.

From the site
Primary Dwelling: Steel Frames Locked In — image 1
Primary Dwelling: Steel Frames Locked In — image 2
Primary Dwelling: Steel Frames Locked In — image 3
Primary Dwelling: Steel Frames Locked In — image 4
Primary Dwelling: Steel Frames Locked In — image 5
Primary Dwelling: Steel Frames Locked In — image 6